Challenge:

Improving the prototype of a biogas power plant placed in a container, built almost without manufacturing drawings, and its productisation.

Solution:

Enmac modelled all parts of the prototype, created manufacturing and isometric drawings and developed the frame structures to be more suitable for serial production.

Result:

A biogas power plant container suitable for serial production, which can be equipped directly at the plant to be ready for commissioning.