Challenge:
Improvement and productization of a biogas power plant prototype placed in a container and built almost entirely without manufacturing drawings.
Solution:
Enmac modelled all parts of the prototype, prepared manufacturing and isometric drawings and improved the framework to make it more suitable for serial production.
Outcome:
A precisely modelled biogas power plant container that is suitable for serial production and that can be equipped at the factory so that it is immediately ready for use.