Challenge:
There was a need for an enrichment plant and reducing the time of installation work done on site.
Solution:
Enmac carried out the plant design project, designing modules that can be equipped at the workshop.
Outcome:
An enrichment plant that can be installed within a short period of time. Its modules are lifted in place on site and the pipes’ flange joints are connected where modules meet.